City of San Marcos Midtown Drainage Improvements
Analyzing Drainage in San Marcos Area
Project Purpose
The watershed for this project area contains multiple problem areas primarily driven by localized flooding as stormwater runoff flows to the Blanco River. Problem areas include multi-family apartment units flooding, the Loop 82/Aquarena Springs underpass at IH-35, and the San Marcos Rehabilitation & Health Care Nursing Home. The purpose of the Preliminary Engineering Report is to study the entire watershed to identify the source of the problems and propose a range of flood mitigation alternatives. Each of the alternatives will include a utility conflict assessment and estimated construction cost. The most beneficial and cost-effective project will be selected to move into detailed design. A maintenance path is also being designed at a 30% level during this phase of the project.
Project Approach
KFA has built an Infoworks 2-dimensional model of the entire watershed to simulate existing runoff. This included data collection, multiple site visits, topographic processing of available LiDAR, hydrologic HMS modeling, and detailed ICM modeling. This model has been validated against historic rainfall events to ensure it is adequately simulating the existing conditions. KFA is currently simulating flood reduction alternatives to find the most beneficial solution for the project area. This project is being primarily funded through the HUD CDBG-DR funding. The KFA team is making sure that all proposed construction meets the requirements of the program to satisfy the grant rules and regulations.
Project Results
KFA proposed mitigation measures with varying levels of cost and complexity based on funding options available to the City using a multi-phased approach. Currently, KFA is developing PS&E for the selected Phase 1 Alternative which is being funded through the HUD CDBG-DR program. Construction of these improvements is scheduled to be completed in late 2022.
Quick Facts
- KFA was tasked with providing preliminary engineering services to analyze the area draining to the intersection of I-35 and Aquarena Springs.
Related Projects
All ProjectsCTRMA 183A Phase III
KFA provided drainage, water quality, and stormwater engineering services for this project, which is located within the watersheds of Brushy…
Location:
Williamson CountyClient Sector:
Regional + State EntitiesCTRMA US 183S Bergstrom Expressway
The Central Texas Regional Mobility Authority (CTRMA) and the Texas Department of Transportation (TxDOT) planned to create the US 183S…
Location:
Travis CountyClient Sector:
Regional + State EntitiesCTRMA/Travis County Elroy Road Improvements
KFA provided drainage, water quality, and wet utility design for this collaborative project between Travis County and the Central Texas…
Location:
Travis CountyCTRMA 290E Manor Expressway
The goal of this project is to link important roadways in the region, including US 183 and the SH 130…
Location:
Travis CountyClient Sector:
Regional + State EntitiesTxDOT US 290 Bridges Design
Project Purpose Three aging bridge structures were identified in the counties to be deficient based on a variety of reasons…
Location:
Gillespie CountyClient Sector:
Regional + State Entities