TxDOT US 59 Widening
Designing for Growth in the TxDOT Houston District
Project Purpose
Due to increases in regional development and truck traffic, TxDOT widened US 59 to convert it from a rural highway to an urban freeway. Within the project limits, which extend from the Wharton County line to east of Darst Road, the existing roadway was widened to the inside to provide shoulders.
Project Approach
KFA served as staff augmentation for the Houston District to lead drainage design services for the hydrologic and hydraulic analysis completed for this project. We performed hydrologic and hydraulic analyses for the design storm events to determine drainage impacts for the proposed improvements. There are two cross structures within the limits of the project: a 10-foot by 7-foot reinforced concrete box culvert and a bridge over Brooks Branch. We developed an analysis of the existing drainage systems and flooding problems in and around the project limits, recommendations and analysis for the proposed conditions, and recommendations for mitigating the increase in impervious cover, floodplain fill grading to mitigate bridge piers, and corresponding increases in flow.
A TxDOT-approved mitigation option that maximizes storm sewer and/or roadside ditches for conveyance and mitigation volume is “best fitting” in the proposed typical section and using the in-system storage of oversized facilities or restrictor structures before outfalls. KFA used this method to create inline detention ponds in the median ditches along US 59 to contain flow in the limited ROW.
Project Results
KFA’s drainage study helped TxDOT develop design plans for the project. The completed widening project provided shoulder safety widening and capacity improvements along the US 59 corridor.
Quick Facts
- Sequential inline ditch detention was employed to avoid additional ROW needs.
- The project used channel grading and scour protection for bridge pier floodplain fill mitigation.
Service:
DrainageRegion:
Southeast/East TexasClient Sector:
Regional + State EntitiesLocation:
Fort Bend CountyRelated Projects
All ProjectsCTRMA 183A Phase III
KFA provided drainage, water quality, and stormwater engineering services for this project, which is located within the watersheds of Brushy…
Location:
Williamson CountyClient Sector:
Regional + State EntitiesCTRMA US 183S Bergstrom Expressway
The Central Texas Regional Mobility Authority (CTRMA) and the Texas Department of Transportation (TxDOT) planned to create the US 183S…
Location:
Travis CountyClient Sector:
Regional + State EntitiesCTRMA/Travis County Elroy Road Improvements
KFA provided drainage, water quality, and wet utility design for this collaborative project between Travis County and the Central Texas…
Location:
Travis CountyCTRMA 290E Manor Expressway
The goal of this project is to link important roadways in the region, including US 183 and the SH 130…
Location:
Travis CountyClient Sector:
Regional + State EntitiesTxDOT US 290 Bridges Design
Project Purpose Three aging bridge structures were identified in the counties to be deficient based on a variety of reasons…
Location:
Gillespie CountyClient Sector:
Regional + State Entities