Narrow Your Results:
Rapid growth in Leander has placed new demands on the water system requiring additional storage and pumping capacity. The Upper…
Location:
Client Sector:
Service:
KFA contracted with the city of Leander to reconstruct and widen a recently annexed 20-foot wide county road to a…
KFA was tasked with providing a route analysis, preliminary design, final design, and bid and construction phase services for the…
The Brushy Creek Regional Utility Authority (BCRUA) developed a regional water system to serve the developing cities of Leander, Round…
KFA prepared water and wastewater master plans to guide the future development of Leander’s collection and distribution systems to meet…
The City of Round Rock needed a large capacity wastewater interceptor to serve future development in the McNutt Creek drainage…
San Antonio Water System (SAWS) tasked KFA with analyzing a 24-inch water main from the pump station to the elevated…
KFA assisted with the rehabilitation of approximately 8,694 LF of 21”-48” diameter deteriorated wastewater main using CIPP as part of…