Please join Hays County, the Texas Department of Transportation, and the K Friese + Associates project team tonight from 6 – 8 p.m. in the Cafeteria of Hays High School for a public workshop on the FM 150 West Alignment Study.
Hays County and The Texas Department of Transportation are considering a realignment of a 5-mile section of existing FM 150 from Arroyo Ranch Road to I-35. The project team has analyzed public input, technical information, and performed further studies and evaluations on the four corridors considered for the FM 150 Alignment Study and at this meeting the preferred corridor will be shared along with the analysis completed to select it. The preferred corridor will be used as the basis for identifying potential roadway alignments that will be the subject of additional study and a public meeting.
There will be a brief open house, with a presentation beginning at 6:15 p.m. There will be a question and answer session, and comments will be collected after the presentation.
For more information, please click here: http://improvefm150.com/alignment-study/